Board A on the bench: the first four days
Two unattended nights on the first Controller board: one bad reply in 58 169 Modbus polls, a working Wi-Fi link, and the tests still to run.
Notes from building Origin89 at km 43: what we tested, what we measured and what we changed because of it.
Follow with the Atom feedTwo unattended nights on the first Controller board: one bad reply in 58 169 Modbus polls, a working Wi-Fi link, and the tests still to run.
The Controller's main board never closes the generator's start contact itself. A second board with two relays, a hardware watchdog and no firmware does, and only while the controller keeps asking. It now holds and drops on the bench, 4.3 s after the last kick.
An off-grid cabin at km 43 in Québec, solar gear and a generator from different makers, and no monitoring that worked with all of it.